Steve Norton Enterprises LLC
The Design / Build Advantage

home
about us
commercial construction
services
tenant improvements
insurance restoration
real estate development
residential
testimonials
safety plan
employment


Steve Norton Enterprises, Design/Build Specialists:

SNE can help customers move from an idea into a successful project through the Design-Build delivery method of contracting. A Design-Build project is a "team" oriented project that utilizes the knowledge, experience, and viewpoint of the contractor, design professionals, and the owner early on in the design phase. In a Design-Build project, the Owner has a single source contract with the Design-Build contractor for both the design and construction of the project. The Design-Build Team (General Contractor, Design Professionals & Subcontractors) coordinates closely through the course of the project to deliver a project which meets the owner's required functionality, budget, and timeframe.

Design/Build Advantages:

The creation of a working partnership between the owner, the contractor, and the architect/engineer results in significant benefits for the owner. Some of these benefits are:

Single Source Responsibility - With the responsibility of design coordination and construction in the hands of a single entity, there is a single point of responsibility for quality, cost, and schedule adherence. In addition, the contractor is able to establish and conform to early budget estimates.

Cost Savings - Design and construction personnel, working and communicating as a team, evaluate the alternative materials and methods efficiently and accurately. Value engineering and constructability is considered at all phases of the project.

Time Savings - Since design and construction are overlapped; and, because re-bidding and re-design is virtually eliminated, total design and construction time can be significantly reduced. Design-Build is ideal for the application of "fast track" construction techniques; material procurement can begin before the construction documents are complete. The resulting time savings translates into earlier occupancy for the owner.

Early Knowledge of Project Costs - Guaranteed maximum costs are known far earlier than in other delivery systems. As the design phase progresses, the contractor can simultaneously estimate construction costs and conceptualize the completed project.

Current Projects:
Alaska Comprehensive Dental Center Wasilla, Alaska
Project Showcase:
Northstar Assisted Living Facility Design-Construct Addition Palmer, Alaska 12
Valley Harvest Church Design-Construct Palmer, Alaska 7

[back to top]